Toledo, José Humberto Dias deRocha, Júlia Bilibio da2020-05-222020-11-292020-05-222020-11-292020https://repositorio.animaeducacao.com.br/handle/ANIMA/11556In construction companies and construction sites in the country, we often see inefficient planning, usually always late, with little or no follow-up. Constructions being delivered late, bad weather being blamed. When in the majority, the little investment in planning is to blame. This study was carried out to demonstrate how we should develop an efficient planning for unification with a 4D modeling. This qualitative explanatory applied research exemplifies the methodology that should be used for research and planning, so that the cost and redo in constructions can be reduced.Nas construtoras e obras no país costumamos ver planejamentos pouco eficientes, em geral sempre atrasados, com pouco ou nenhum acompanhamento. Obras sendo entregues atrasadas, as intempéries sendo culpadas. Quando, em maioria, o pouco investimento em planejamento é o culpado. Este estudo foi realizado para demonstrar como devemos desenvolver um planejamento eficiente para a unificação com uma modelagem 4D. Essa pesquisa qualitativa explicativa aplicada, exemplifica a metodologia que deve ser utilizada para pesquisa e montagem de um planejamento, para que possa ser reduzido o custo e o retrabalho nas construções.16 fpt-BRAttribution-NonCommercial-NoDerivs 3.0 BrazilConstruçãoLogística4DBIMPlanejamentoDesenvolvimento de logística e planejamento para o 4D na plataforma BIM: aplicado a alvenaria estruturalLogistics development and planning for 4D on the BIM platform: applied to structural masonryArtigo Científico