MBA Gestão de Obras e Projetos
URI Permanente para esta coleção
Navegar
Navegando MBA Gestão de Obras e Projetos por Autor "Toledo, José Humberto Dias de"
Agora exibindo 1 - 3 de 3
Resultados por página
Opções de Ordenação
Artigo Científico Acesso aberto Desenvolvimento de logística e planejamento para o 4D na plataforma BIM: aplicado a alvenaria estrutural(2020) Rocha, Júlia Bilibio daIn construction companies and construction sites in the country, we often see inefficient planning, usually always late, with little or no follow-up. Constructions being delivered late, bad weather being blamed. When in the majority, the little investment in planning is to blame. This study was carried out to demonstrate how we should develop an efficient planning for unification with a 4D modeling. This qualitative explanatory applied research exemplifies the methodology that should be used for research and planning, so that the cost and redo in constructions can be reduced.Artigo Científico Acesso aberto Tecnologia BIM: integrado ao planejamento 4d e 5d na arquitetura de interiores(2019) Rebelo, Fernando AlexandreThrough the advancement of software technologies, the building industry followed this path with the objective of optimizing the design processes and visualizing the stages of construction even before entering the construction site. This made it possible to reduce costs and time, enabling the designer to analyze risks and make decisions with precision. Interior architecture was able to take advantage of these mechanisms since its design and execution process has several steps that need to be under control. Thus, 4D and 5D planning is fundamental to visualize the project construction steps linked to the execution cost, helping the designer in the decision making that may impact the final project result.Estudo de Caso Acesso aberto A viabilidade econômica sustentável do alicerce de concreto com bambu para casas de madeira(2019) Benedet, Caroline de OliveiraBuilding construction is still the industry which generates solid waste more than any other industrial sectors around the world and the way the rejected materials are thrown out has been the reason of many studies, owing to a great deal of damage waste causes to the environment. Concrete is a structural material mostly used in this sector and in addition to that is also very badly dismissed. This technical study has proved the sustainable and economic feasibility of the reuse of concrete waste for building concrete foundations by using bamboos instead of iron beams.