Análise da eficácia do BIM em função do prazo e incompatibilidades de projeto

dc.contributor.advisorCoghi, João Felipe Fernandes
dc.contributor.authorFARIAS, Ana Virginia de Oliveira
dc.contributor.authorGOMES, Andréia Aparecida Batista
dc.contributor.authorSORIANO, Lucas de Souza
dc.contributor.authorSILVEIRA, Marco Antônio Nasser da
dc.contributor.authorSILVA, Pedro Henrique Gomes
dc.contributor.authorBOGNER, Rodrigo Oliveira Martins
dc.coverage.spatialSão Paulo
dc.date.accessioned2024-01-10T19:12:57Z
dc.date.available2024-01-10T19:12:57Z
dc.date.issued2023-12
dc.description.abstractO presente artigo teve como objetivo realizar uma análise da metodologia BIM voltada para o planejamento de projeto e sua eficiência em uma casa de alto padrão em estrutura metálica, localizado em São Paulo, de modo a medir seu impacto no cronograma físico do projeto. Sendo que, esta análise foi realizada por meio das incompatibilidades, prevenidas em função da aplicação do BIM, devido erros de projeto que ocorressem ao longo da execução do empreendimento. Deste modo, realizou-se uma classificação e análise de todas as incompatibilidades do projeto, classificando-as por níveis de gravidade por meio do impacto físico e complexidade de solução da situação problema. Adicionalmente, foi desenvolvida uma pesquisa com profissionais atuantes na área da construção civil, para obtenção de um prazo médio para cada solução, conforme sua expertise, determinado para um protocolo padrão de todas as incompatibilidades apontadas no estudo e seu respectivo nível. Em posse destas informações, foi possível determinar de forma mais precisa o impacto no cronograma físico da obra, assim, avaliando a eficácia da utilização do BIM para um melhor gerenciamento das ações durante a execução de um projeto.pt
dc.description.abstractThe objective of this article was to carry out an analysis of the BIM methodology aimed at project planning and its efficiency in a high-end steel structure project, located in São Paulo, in order to measure its impact on the project's physical schedule. Therefore, this analysis was carried out through incompatibilities, prevented due to the application of BIM, simulated as design errors that occurred throughout the execution of the project. In this way, a classification and analysis of all project incompatibilities was carried out, classifying levels of severity through the physical impact and complexity of the problem solving. Additionally, a survey was performed with professionals working in the construction industry, to obtain an average deadline for each solution, according to their expertise, determined for a standard protocol of all incompatibilities highlighted in the study and their respective level. Through this methodology it was possible to more accurately determine the impact on the physical schedule of the work, thus evaluating the effectiveness of using BIM for better management of actions during the execution of a project.en
dc.format.extent15
dc.identifier.urihttps://repositorio.animaeducacao.com.br/handle/ANIMA/40194
dc.language.isopt
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 Brazilen
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/br/
dc.subjectBIM
dc.subjectcronograma
dc.subjectincompatibilidades
dc.subjectprazo
dc.titleAnálise da eficácia do BIM em função do prazo e incompatibilidades de projeto
dc.title.alternativeAnalysis of BIM effectiveness in function of project deadline and incompabilities
dc.typeArtigo Científico
local.modalidade.estudoPresencial
local.rights.policyAcesso aberto

Arquivos

Pacote Original
Agora exibindo 1 - 1 de 1
Nenhuma Miniatura disponível
Nome:
Análise da eficácia do BIM em função do prazo e incompatibilidades de projeto.pdf
Tamanho:
1.88 MB
Formato:
Adobe Portable Document Format
Licença do Pacote
Agora exibindo 1 - 1 de 1
Nenhuma Miniatura disponível
Nome:
license.txt
Tamanho:
956 B
Formato:
Item-specific license agreed upon to submission
Descrição: