Estudo das patologias no método construtivo de paredes de concreto moldado in loco com fôrma metálica: estudo de caso
Carregando...
Data
2022-12-16
Tipo de documento
Monografia
Título da Revista
ISSN da Revista
Título de Volume
Área do conhecimento
Engenharias
Modalidade de acesso
Acesso aberto
Editora
Autores
Guindani, Ana Paula dos Santos
Orientador
Perez, Diego Marisco
Coorientador
Resumo
O processo ser objetivo e sem grandes complexidades, uma desvantagem seria o descontrole sobre o processo construtivo de maneira mais rotineira, provocado por inúmeras causas como por exemplo mão de obra desqualificada, descontrole dos materiais utilizados e sobre a forma de manipula-los, causando danos as formas e até inutilizando-as, provocando inexecução do método, visto que o conjunto só é útil quando completo.
The objective of this final degree work is to identify the main pathological damage to concrete walls molded in loco with removable forms, as well as possible motivations and corrections for this practice. The main advantages and disadvantages of this new methodology of the civil construction market were addressed, and probable resources for solutions of pathological problems within each stage of the construction method were offered. As a specific objective, it collaborates with the treatment of the points observed by measures and executive methods applied in different ways among some construction companies, namely: positioning of ironwire, steel bar and welded mesh, electrical and hydraulic installations, formwork assembly, shoring and unmold, concrete fabrication and concreting and, finally, ceramic laying.
The objective of this final degree work is to identify the main pathological damage to concrete walls molded in loco with removable forms, as well as possible motivations and corrections for this practice. The main advantages and disadvantages of this new methodology of the civil construction market were addressed, and probable resources for solutions of pathological problems within each stage of the construction method were offered. As a specific objective, it collaborates with the treatment of the points observed by measures and executive methods applied in different ways among some construction companies, namely: positioning of ironwire, steel bar and welded mesh, electrical and hydraulic installations, formwork assembly, shoring and unmold, concrete fabrication and concreting and, finally, ceramic laying.
Palavras-chave
Parede de concreto, Patologias de concreto moldado in loco, Redução de danos patológicos de concreto, Construção em formas metálicas